Let’s take a look at what you can find in Issue 83 of Wiring Matters (November 2020)
The impact of Amendment 2 of the 18th edition (BS 7671:2018+A2:2022)
In this article, we look at the impact that some of the proposed changes in the draft for public comment (DPC) will have on electrical installations. We focus on Chapter 42, Chapter 44 and the new Chapter 82.
COVID-19 and how it has changed the way we work
Steven Devine talks about some of the effects that COVID-19 has had on the industry.
Current-carrying capacity of cables installed in concrete cable troughs
A discussion regarding the maximum number of cables that can be installed in a pre-formed concrete cable trough?
How I became a Chartered Engineer
Michael Peace shares his experience of becoming a Chartered Engineer.
Section 514 identification and notices in the Amendment No. 2 Draft for Public Comment
The draft for public comment (DPC) of Amendment No. 2 to BS 7671:2018 contains proposed changes to Section 514 Identification and notices. This article provides an overview of those proposed changes, and the reasons behind them.
Sponsored: Surge Protection – what you need to know
Surge protection devices (SPD) are a requirement under the 18th Edition of the Wiring Regulations and essential in protecting equipment from damage. Here, Dominick Sandford, Director and Head of Merchandising & Marketing at ElectricalDirect explains the requirements.