Author Archives: admin

Project launched to support EV chargepoint infrastructure rollout

The Geospatial Commission has today launched a discovery project to explore how location data can be better utilised to support planning and delivery of electric vehicle charge points by local authorities.

The UK is committed to transitioning to electric vehicles (EV) in support of ambitious net zero targets. Local authorities will play a crucial role enabling this transition.

This project will support the approach set out in the government’s Electric Vehicle Infrastructure Strategy, published today by the Department for Transport, which focuses on enabling the rollout of a robust EV charging infrastructure network by 2030. Setting out a vision and approach for EV infrastructure roll-out and expectations of key stakeholders, the Strategy identifies that addressing barriers to data sharing will be important to enable decision making.

Dr Steve Unger, Commissioner at the Geospatial Commission, said:

Location data will play a key role in planning the UK’s transition to electric vehicles and help make net zero a reality. Through this project, the Geospatial Commission will understand the challenges faced by local authorities who wish to exploit location data. By working together, we will be able to unlock the potential for data-driven innovation in transport.

The Geospatial Commission discovery project includes workshops with 10 local authorities to identify challenges and opportunities for better use of location data in the rollout of EV chargepoint infrastructure. This project will be undertaken by technical specialists Frazer-Nash Consultancy.

Matthew Perrin, Digital Services Innovation Lead, Frazer-Nash Consultancy, said:

Geospatial data is vital to planning, installing and running an effective charging infrastructure for electric vehicles. We are really looking forward to working with the Geospatial Commission and local authorities on this important study, providing our expertise in geospatial data and discovery to enable this important step on the UK’s journey to net zero.

Councillor Helen Hayden, Executive Member for Infrastructure and Climate from Leeds City Council, said:

Over the last five years, Leeds has taken a range of actions, offering free electric van trials, discounted parking and requiring charge points in new developments, to accelerate our city’s transition to less polluting vehicles.

With figures showing that the number of plug-in vehicles in Leeds has doubled over the last year, it is vitally important that we understand how best to expand and improve access to charging infrastructure for drivers on the go or without private parking. We are therefore excited to be part of this timely project.

The following local authorities are involved in the project:

  1. Oxfordshire County Council
  2. City of York Council
  3. Norfolk County Council
  4. Greater Manchester Combined Authority
  5. West Sussex County Council
  6. Cornwall Council
  7. Kent County Council
  8. Leeds City Council
  9. Wiltshire Council
  10. Cheshire East Council

Boris Johnson meets nuclear experts and pushes for more nuclear power plants

Prime Minister Boris Johnson hosted a roundtable at Downing Street yesterday with leaders from the nuclear industry to discuss how to improve domestic energy security and rapidly accelerate nuclear projects in the UK.

The Prime Minister made clear the vision for nuclear to be a major part of the UK’s future energy system as a clean, reliable and safe energy source. He set out this government’s commitment to supporting the industry to develop a thriving pipeline of future nuclear projects in the UK in a cost-effective way.

Industry representatives set out the various technologies and projects they are developing, from larger nuclear power plants to small modular reactors, capitalising on both British and international expertise.

The Prime Minister invited views on how the UK can accelerate rapid progress on securing new nuclear capacity. They discussed the benefits of scaling up investment and removing barriers facing development, agreeing to work together to help projects become operational more quickly and cheaply.

The Prime Minister and attendees also reflected on the need to build strong skills and supply chains to support the UK nuclear industry.

The roundtable comes ahead of the publication of the Government’s energy security strategy this month, with renewable energy, nuclear and domestic gas all a crucial part of achieving its aims.

After the roundtable, the Prime Minister met with apprentices from EDF Energy and saw a model of Rolls Royce’s Small Modular Reactor design.

Business Secretary Kwasi Kwarteng, Chancellor of the Duchy of Lancaster Steve Barclay and Exchequer Secretary to the Treasury Helen Whatley also attended the roundtable.

Organisations who attended included: Nuclear Industry Association, Aviva Investors, Balfour Beatty, Bechtel Group Incorporated, EDF Energy, GE Hitachi Nuclear Energy, L&G, MACE, NAMRC, Nuclear Power Jacobs, NuScale, Rolls Royce, Rothesay Life, Westinghouse Electric Company, Urenco, and USS.

New solar farm to be built at former landfill site in the West Midlands

The Environment Agency is continuing to carry out its regulation of a historic, non-hazardous landfill site in Wednesfield, where construction of a new solar farm is currently underway.

City of Wolverhampton Council, the current operator of the closed Bowmans Harbour landfill, is enabling The Royal Wolverhampton NHS Trust to develop the site to generate significant levels of renewable energy to power the nearby New Cross Hospital, in a step towards its goal of becoming net carbon zero by 2040.

As part of the planning process, City of Wolverhampton Council is required to manage the landfill in its closed state by retaining the existing landfill monitoring infrastructure and continuing to provide access for the Environment Agency to carry out its regulation of the site.

The Environment Agency has also highlighted to the council of the need to avoid damage to the cap of the landfill to prevent any issues going forward.

The site, which was formerly mined for coal, was operated as a landfill until it was closed and capped in 1996-1997. Since then, the Environment Agency has continued to regulate the site, ensuring monitoring and maintenance of the site is managed in accordance with the site’s environmental permit.

The solar farm, which at 11 hectares, is the size of around 22 football pitches and is due to be operational by summer this year, even though the site will not be fully complete by this time. It is estimated that the solar energy will power the hospital for three quarters of the year – around 288 days of self-generated renewable energy.

Joe Craddock, Environment Officer at the Environment Agency said:

It’s fantastic to see a former landfill being used in this way to provide a renewable energy source for the hospital.

We have taken the opportunity of working with the council to not only maintain but also improve the infrastructure of the closed landfill. We have required City of Wolverhampton Council to review and improve the leachate and gas wells on the site and make updates to the gas flare.*

We will continue to monitor and manage the site as it changes its use into a new source of renewable energy.

The improvements to the landfill infrastructure are important as they reduce the amount of greenhouse gasses being emitted from the site.

Background information

The solar farm is located approximately 1 mile to the north-east of Wolverhampton city centre and approximately 0.5 mile south of Wednesfield village centre.

The solar farm is planned to produce 6.9 megawatts-peak per annum which will be fed direct to New Cross Hospital. New Cross Hospital will be the first hospital in England to fully utilise and operate its own facility providing renewable energy.

The repository at Bowmans Harbour is the subject of an existing environmental permit issued to City of Wolverhampton Council by the Environment Agency in respect of environmental monitoring.

The Environment Agency regulates the environmental permits held by a landfill operator, including a closed landfill.  Within the environmental permits there are conditions controlling the operations that the site can carry out, which cover emission limits and the location and frequency of environmental monitoring.

The conditions of the environmental permit are designed to prevent pollution and minimise impacts to the environment and human health.  Appropriate measures are required to be taken by the holder of the environmental permit through the application of best practice.

There is a long-term monitoring contract in place with City of Wolverhampton Council to meet the conditions of the environmental permit.

Less potent greenhouse gasses are emitted if the landfill gas is burnt as opposed to being vented* so reducing the volume of gas being vented on the site will have a positive effect on the environment in terms of the greenhouse gases being emitted by the site.

  • When the gas is vented, a higher percentage of methane is released to the atmosphere which has a greater greenhouse effect. Burning the landfill gas reduces the volume of more potent greenhouse gases being released.

Plug In Lamp Holder With Switch And UK Plug – Product Recall

A plug-in lampholder with switch and UK plug. The plug is connected to the lampholder by a flexible neck to allow adjustment of the lighting position.

The fitting is E27, for a bulb with a screw thread fitting.

This product poses a serious risk of electric shock as the screws that make an electrical connection were not locked against loosening, and there was possible access to live parts. There was single insulation mains potential wiring in contact with the accessible unearthed metallic neck of the lampholder.

The mains plug portion of this product did not meet the requirements of BS 1363. Additionally, the product was not compliant with the marking requirement of the relevant standard. The product does not meet the requirements of the Electrical Equipment (Safety) Regulations 2016.

If you believe you have an affected product stop using it immediately and contact the retailer for further advice.

Models affected

Model no: ZPP-E27 (ADZPP27)
Bar code X00175QSO7

BC B22 Bayonet Cap To ES E27 Screw Cap Lamp holder Adaptor – Product Recall

The product poses a serious risk of electric shock as the design of this product allows for the possible access to live parts.

When tested, the lamp cap was accessible using the standard test gauge and it became live.

Additionally, the product was not compliant with the marking requirement of the relevant standard.

The product does not meet the requirements of the Electrical Equipment (Safety) Regulations 2016.

If you believe you have an affected product stop using it immediately and contact the retailer for further advice.